Linking DFMEAs and Control Plans

Questions?

800-810-8326 or 802-496-5888

It's

Linking DFMEAs and Control Plans

 

Login for QualityTrainingPortal


Wish you could login to start your training RIGHT NOW but you don't have an account?

No problem.  You get instant access to training courses when you purchase them through our on-line store.

QualityTrainingPortal Powered by Esprit-LMS

Back Up Next

Linking DFMEAs and Control Plans

A natural link exists between FMEAs and Control Plans.

The purpose of a Control Plan is to:

  • Minimize variation.
  • Provide a structured approach for control.
  • Establish a well thought-out reaction plan.
  • Document and communicate failures and improvements.
  • Enhance customer satisfaction.

The primary reason for developing a Control Plan from a DFMEA is to use the DFMEA for setting process control procedures and identifying primary control points for the process the product will be made on.

  • A Control Plan linked to the DFMEA provides a structured documentation and communication vehicle for the process control group.

Key components of a Control Plan include the:

  • The control factor.
  • Specifications and tolerances of control factors.
  • Measurement system or technique.
  • Sample size and sample frequency.
  • Control method.
  • Reaction plan.

Back Up Next

Privacy Statement
© 2000-2006 Resource Engineering, Inc.  All rights reserved. 
Please contact the webmaster at webmaster@qualitytrainingportal.com with comments about this site.